WEEKLY DIGEST - 18.10.2017



WEEKLY DIGEST

25 High Voltage Transformer Tests and Commissioning Procedures (Before Energizing)

When transformers are received from the factory or reallocated from another location it is necessary to verify the following: that each transformer is dry, no damage has occurred during shipping, internal connections have not been loosened, the transformer’s ratio, polarity, and impedance agree with its nameplate, its major insulation structure is intact, wiring insulation has not been bridged, and the transformer is ready for service. [Download Guide]



The basic functions of LV switchgear and circuit breakers [Download Guide]


Programmable logic controller (PLC) book [Download Book]


Motor Voltage Drop - MS Excel Spreadsheet [Download Spreadsheet]

#HVTransformerTests #commissioning #procedure #LVswitchgear #circuitbreaker #basicfunctions #PLCC #motor #voltagedrop

Blog Posts

  • Beyaz LinkedIn Simge
  • Beyaz Facebook Simge
  • Beyaz Heyecan Simge

BU İÇERİĞE EMOJİ İLE TEPKİ VER

Relaxing Sea Sound - Unknow
00:00 / 00:00
Rate websitenot goodnot greatgoodgreatperfectRate website
  • Grey Facebook Icon
  • Grey Twitter Icon
  • Grey LinkedIn Icon
  • Grey iTunes Icon
  • Grey YouTube Icon
  • Grey Instagram Icon
  • Grey Blogger Icon
  • Grey RSS Icon

"Real success delivers you up to a high degree of Allah's floor" Hüseyin Güzel

"Real success delivers you up to a high degree of Allah's floor" Hüseyin Güzel

Subscribe for updates!

© Copyright 2023 by Hüseyin GÜZEL

     All Rights Reserved by Technical Library