Factory and Site Acceptance Tests (FAT, SAT) For Electrical and Automation Systems In a Power Plant
The thesis consists of an investigation of what is to be tested with FAT (Factory Acceptance Test) and SAT (Site Acceptance Test), and also how to do the testing. The result of this investigation is a basic template of how these documents can be designed. Factory Acceptance Tests are done at the factory to make sure that certain requirements are met, which results in high quality products.